Skip to main content

Document examples

See how clear records can help you organise a repair journey.

Inside your R2R Social Housing documents

These previews use the actual branded checklist templates. The first page contains fictional case details; the second page shows a blank checklist layout. Each preview is a static image, not a fillable form. Only the first two pages of each document are shown.

These Social Housing examples do not show the Private Renting or Private Landlord document range. Availability and package inclusions will be confirmed separately. The examples below illustrate record structure rather than actual generated documents.

These are fictional examples of record structure, not copies of generated R2R documents or ready-to-send legal letters. Actual formats, content and availability depend on the service and package. No real case data is used.

FICTIONAL STRUCTURE EXAMPLE

Repair report record

Example issue
A recurring leak above the kitchen window.
First noticed
8 October 2026 — fictional date.
What was reported
Location, visible damage and whether the leak was continuing.
Communication record
Keep the date, method, recipient and a copy of the actual report.
Follow-up record
Record any acknowledgement, appointment or response received.

FICTIONAL STRUCTURE EXAMPLE

Evidence checklist

Photographs
Wide view, close-up and date taken.
Correspondence
Original repair report, follow-ups and replies.
Visits and appointments
Date, attendance and what was done.
Impact notes
What changed in use of the home; record only relevant facts.
Outstanding information
List missing records without treating them as established facts.

FICTIONAL STRUCTURE EXAMPLE

Chronology

8 October — example
Issue noticed and photographed.
9 October — example
Repair reported in writing; copy retained.
10 October — example
Acknowledgement received and saved.
Next entry
Add the actual next event when it happens; do not invent an appointment or response.

FICTIONAL STRUCTURE EXAMPLE

Landlord repair record

Property
Example property reference — no real address.
Report
Record the date received and the issue described.
Assessment
Record the inspection findings and the basis for priority.
Actions
Record owner, contractor, appointments and tenant communication.
Completion
Retain work evidence, tenant feedback and any outstanding actions.

Before using a document

Check names, dates, facts and the recipient. Keep the final copy and record when and how it was sent. Generating a document does not itself confirm delivery.

Find my R2R route →